Showing 41–60 of 680 resultsSorted by latest
-

Multi-category building material distributors face a constant challenge: how to display diverse products without buying separate display systems for each. The CE014 solves that with modular, reconfigu
-

The CT2143 locking casters are TK-200 series — the same specification used in hospital equipment. Silent rolling, full-lock at pedal press, and rated for years of daily repositioning across hard floor
-

We engineered the CT911 center of gravity 40% below the frame midpoint after studying how customers interact with stone displays. They lean slabs forward to see the polished face, and the rack must no
-

Tile retailers tell us their customers make faster decisions when they can compare 6-8 slabs side by side. The CC010 enables that comparison shopping experience without requiring a warehouse-sized sho
-

We engineered the SR1212 center of gravity 40% below the frame midpoint after studying how customers interact with stone displays. They lean slabs forward to see the polished face, and the rack must n
-

The SG607 frame is engineered with a center of gravity 40% below the midpoint. Even with all sample panels pulled out simultaneously, the rack stays planted.
-

The CT2181 frame starts as cold-rolled steel tube, cut and welded on CNC jigs to maintain consistent slot spacing across every unit. No shims, no field adjustments needed.
-

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The CT2146 undergoes a 72-hour salt spray test before it leaves our facility.
-

Tile samples look their best when customers can see the full face without bending or reaching. The CF2057 angles every panel slightly toward the viewer, reducing glare from overhead showroom lighting.
-

Tile retailers tell us their customers make faster decisions when they can compare 6-8 slabs side by side. The CC010 enables that comparison shopping experience without requiring a warehouse-sized sho
-

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The CE948 undergoes a 72-hour salt spray test before it leaves our facility.
-

Unlike welded display fixtures that ship in bulky crates, the CE061 packs flat to roughly 12% of its assembled volume. This cuts your freight cost and simplifies receiving.
-

We pre-drill and tap every threaded insert on the SRL026 before finishing, so the powder coat never fills the threads. Your assembly bolts go in clean every time.
-

Tile samples look their best when customers can see the full face without bending or reaching. The SRL009 angles every panel slightly toward the viewer, reducing glare from overhead showroom lighting.
-

Showrooms in coastal cities face salt-air corrosion that eats standard powder coat in under a year. The SG1007 undergoes a 72-hour salt spray test before it leaves our facility.
-

Natural stone slabs are heavy, irregular, and expensive to replace. The CE021 was engineered around those realities — load-tested to 120kg per slot with a safety factor of 2.5.
-

We manufacture the SOLUTION in our Xiamen facility where we control every step from steel procurement to final assembly. No subcontractors, no quality gaps.
-

Stone showrooms face constant tension: display more products to sell more, but do not overcrowd the space. The STAND uses a staggered front-to-back layout that shows every slab face from a single aisl
-

The STAND was field-tested for 18 months in a high-traffic Dubai showroom before we released the design. Every improvement between prototype and production came from watching real customers interact w
-

We keep the SOLUTIONS in stock across 3 standard widths and 5 slot configurations. Most orders ship within 7 business days because we build frames ahead of demand.